Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 27 Feb 2020, 10:45
by pushkin
Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 27 Feb 2020, 11:02
by Kuasmeda
Above all it is being built completely by Eritreans for Eritreans. Eritrea talk the talk, and walk the walk. This is really very bad example for those who are waiting for others to come and save them.
Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 27 Feb 2020, 11:09
by sebdoyeley
Kuasmeda wrote: ↑27 Feb 2020, 11:02
Above all it is being built completely by Eritreans for Eritreans. Eritrea talk the talk, and walk the walk. This is really very bad example for those who are waiting for others to come and save them.
brother Kuasmeda
how many dam have we built through out the country in this last 20 years ?
Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 27 Feb 2020, 11:14
by Kuasmeda
Brother sebdoyeley! Eritrea has built more than 300 agriculture and water reservoir dams to ensure food security and alleviate potable water shortages
sebdoyeley wrote: ↑27 Feb 2020, 11:09
Kuasmeda wrote: ↑27 Feb 2020, 11:02
Above all it is being built completely by Eritreans for Eritreans. Eritrea talk the talk, and walk the walk. This is really very bad example for those who are waiting for others to come and save them.
brother Kuasmeda
how many dam have we built through out the country in this last 20 years ?
Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 27 Feb 2020, 11:28
by sebdoyeley
Kuasmeda wrote: ↑27 Feb 2020, 11:14
Brother sebdoyeley! Eritrea has built more than 300 agriculture and water reservoir dams to ensure food security and alleviate potable water shortages
sebdoyeley wrote: ↑27 Feb 2020, 11:09
Kuasmeda wrote: ↑27 Feb 2020, 11:02
Above all it is being built completely by Eritreans for Eritreans. Eritrea talk the talk, and walk the walk. This is really very bad example for those who are waiting for others to come and save them.
brother Kuasmeda
how many dam have we built through out the country in this last 20 years ?
300 dam is impresive move, with no help from world bank or USAID
Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 27 Feb 2020, 12:01
by Temt
Yes, that is very true many dams have been built by our Warsay Yikealo programs. Now, this is not counting the existing diga Sembel, May nefHi, Beleza, Adi shieka.
After independence, here is a list of the major once that were built, again by Eritrean sweat and know how:
፩ይቲ ዲጋ ከርከበት
፪ይቲ ዲጋ ባደሚት
፫ይቲ ዲጋ ገርሰት
፬ይቲ ዲጋ ዓሊግድር
፭ይቲ ዲጋ ፋንኮ ራዊ
፮ይቲ ዲጋ ፋንኮ ጽሙእ
፯ይቲ ዲጋ ሰመሞ
፰ይቲ ዲጋ ጋሕተላይ
፱ይቲ ዲጋ ምስላም (ገርገረራ)
፲ይቲ ዲጋ ጠቐራ (ዓዲ ሓሎ)
and ዲጋ ተኮር that was built by the Koreans.
Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 27 Feb 2020, 14:10
by Temt
Photo taken near Hashvirai Dam in Haqqat sub-zone. (C/o Mahmud Frezer)

Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 27 Feb 2020, 18:58
by pushkin
Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 27 Feb 2020, 19:06
by Ethoash
all Eritrean are stupid dumb or what kind of dam they r talking .. not all dam are equal Ethiopian dam called hydro dam big different then reservoir dam... hydro dam u can generate hydro or power but dam only keep the water as the name suggested reservoir dam. in Ethiopia we have a lot of reservoir dam and water channel 100 km length only one sugar project have their own reservoir dam.. community have reservoir dam they r in 1000 of them .. so please please dont compere your small dam with our hydro dam.. even one hydro dam that generate only 300mw not big enough we r building 20 time the size of one 300 mw dam ... u r not talking about Amhara u r talking about golden rule that ended two years ago.. so dont embarrass yourself by showing your ኩሬ
Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 27 Feb 2020, 19:10
by Andertan
Ethoash if I had a chance I would tie you Upside down and cook you alive for the dogs to eat it will generate income for the homeless dogs in Addis Ababa and will turn into a commodity that people can buy from market for there dog and help the economy grow by 9% margin under Satan atta kifu Shimalagey
Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 27 Feb 2020, 19:20
by Ethoash
Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 28 Feb 2020, 00:28
by Zmeselo
Drip irrigation system near Semomo Dam, Adi Quala Sub zone.
Gergera Dam
Cultivation of modern date palm trees, around Gerset Dam.
Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 28 Feb 2020, 07:02
by Sabur
DAM Constructions, Road Constructions and Housing Constructions would have been achieved more efficiently and built professionally by allowing Eritrean Private Construction Companies that existed right after Independence to bid for the projects.
In Eritrea the dictator Isayas controls everything - he is an Engineer, a Teacher, an Economist, a Doctor, a Farmer (some of his cadres/trolls call him ዓቄታይ in reference to a Peasant). He is everything and he is everywhere.
No one knows how much Capital (Money+man hours) spent to build these Dams. No Accountability. Remember the Massawa Airport Project.
The government's job should be to Institute Right Policies and Implement them transparently to prevent corruption; not with Stalin Like leadership of Isayas.
Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 28 Feb 2020, 07:08
by Zmeselo

Can you see the fruit of Gahtelay dam? A lake in-between the mountains is already forming. I took this picture far away up around Dongolo, a few weeks ago. (
courtesy of Mela ሜላ @Ertrawit)
Re: Construction of Gahtelay Dam (capacity 50M cu.m) is 95% complete!!!!
Posted: 28 Feb 2020, 07:22
by Sabur
DAM Constructions, Road Constructions and Housing Constructions would have been achieved more efficiently and built professionally by allowing Eritrean Private Construction Companies that existed right after Independence to bid for the projects.
In Eritrea the High School graduate dictator Isayas controls everything - he is an Engineer, a Teacher, an Economist, a Doctor, a Farmer (some of his cadres/trolls call him ዓቄታይ in reference to a Peasant). He is everything and he is everywhere.
No one knows how much Capital (Money+Man hours) spent to build these Dams. No Accountability. Remember the Massawa Airport Project.
The government's job should be to Institute Right Policies and Implement them transparently to prevent corruption.
And It is impossible when you have Stalin Like leadership of Isayas in Eritrea.